SolarAPP+ is free online software that checks a home solar or battery design against code and issues the permit in minutes, where the city participates.

Most permit software is a digital version of the counter: you upload a PDF, and a person reads it when they get to it. SolarAPP+ is the rare kind that does the reading itself, and does it before you have finished your coffee.

What is SolarAPP+?

SolarAPP+ (Solar Automated Permit Processing Plus) is an online platform that checks a residential solar or battery design against code and, if it complies, issues the approval on the spot. It was developed by the National Renewable Energy Laboratory (NREL) with Department of Energy funding and is now run by the SolarAPP Foundation, an independent nonprofit. It is free for jurisdictions to adopt, and installers pay a small fee per project.

The catch is in the word "participating." SolarAPP+ only works where the local building department has adopted it, and only for systems that fit its scope. The rest of this post covers how it works from the installer's side, what qualifies, how to find out whether a city uses it, and what still happens in the field.

How SolarAPP+ works for an installer

The workflow is short:

  1. Register once. Each contractor sets up one SolarAPP+ account, and it works in every participating jurisdiction. You still have to meet that jurisdiction's own licensing or registration requirements.
  2. Enter the design. Instead of uploading a plan set for review, you enter system details through a guided form: modules, inverters, racking, the point of interconnection, and so on.
  3. Get instant feedback. The software checks the entries against structural, fire, electrical and product safety rules, using approved equipment lists and the jurisdiction's adopted codes. Anything noncompliant is flagged right away, so you fix it in the platform instead of waiting for a correction letter.
  4. Pay and receive approval documents. Once the design passes, you pay and receive the approval documents, including an inspection checklist built for that specific project.

What happens next depends on how the city set it up. In some places SolarAPP+ issues the permit directly. In others, called the "With GovTech" model, you take the SolarAPP+ approval and file it in the city's own permit portal. Contra Costa County, California, for example, has installers register with SolarAPP+, then apply in the county's ePermits Center under a "SolarAPP+ Approved Permit" type with the approval document attached, and says the permit is typically issued by email within a few minutes.

What does SolarAPP+ cost?

There are two fees, and they are separate:

  • The jurisdiction's permit fee. SolarAPP+ does not change it. The city or county still sets and collects its own permit fee.
  • The SolarAPP+ project fee. This is paid to SolarAPP+. Contra Costa County lists it as $35 for a solar system plus $25 for add-on energy storage, in addition to the county's building permit fees.

Depending on the setup, you pay both at the end of the SolarAPP+ application, or pay SolarAPP+ there and the permit fee through the city's portal.

Which systems qualify for SolarAPP+?

SolarAPP+ is built for standard residential rooftop systems. Per its help center, the electrical scope includes:

  • A service rating of 400 A or less
  • Service disconnects and busbars rated 225 A or less
  • PV systems up to 38.4 kW, if they meet certain installation characteristics
  • Individual batteries up to 20 kWh, and total storage up to 80 kWh depending on where the batteries are installed

The property has to be a detached one- or two-family home, a townhome up to three stories with its own egress and production meter, or a qualifying accessory structure or ADU.

Out of scope: ground-mounted, ballasted, homeowner-installed, multi-family, commercial and community or utility-scale systems, mobile homes, and townhomes with roof penetrations within 4 feet of a fire-rated property line. Those go through the jurisdiction's normal plan review.

Jurisdictions can narrow this further. Contra Costa County, for instance, limits SolarAPP+ to rooftop systems on the main dwelling and excludes parcels in a FEMA special flood hazard area, airport safety zones and registered historic properties. Read the local SolarAPP+ page before assuming a job qualifies.

Does SolarAPP+ cover batteries?

Yes, in two ways. Solar and storage installed together is part of standard SolarAPP+ review. Battery-only installs and batteries added to an existing solar system are covered by a separate Storage Only add-on, which each jurisdiction has to switch on.

SolarAPP+ currently lists 20 jurisdictions with Storage Only enabled: 15 in California, plus Tempe, Arizona; Alamosa County, Colorado; Guilford, Connecticut; Betterton, Maryland; Keene, New Hampshire; and Logan, Utah. It says the add-on is available to every jurisdiction already on the platform at no cost, so if you install batteries in a SolarAPP+ city that has not turned it on, it is fair to ask.

How do I know if my city uses SolarAPP+?

SolarAPP+ publishes a map and a searchable table of participating jurisdictions on gosolarapp.org, with the products each one supports: solar, solar plus storage, Storage Only, and in some places main panel upgrades or main breaker derates. The site says it serves more than 350 jurisdictions.

Coverage is uneven by state:

  • California has the most, largely because of SB 379 (2022). It requires non-exempt cities and counties to offer an online, automated permitting platform for residential solar up to 38.4 kW AC and paired storage. Jurisdictions over 50,000 people had to comply by September 30, 2023, and smaller ones by September 30, 2024. The law references SolarAPP+, though cities may use other compliant platforms.
  • Colorado went statewide on the electrical side in 2025. The Department of Regulatory Agencies (DORA) now uses SolarAPP+ for electrical plan review of residential solar and storage in more than 200 jurisdictions. A local building permit may still be required separately.
  • New Jersey signed a law in December 2025 directing the state to build an automated online permitting platform for residential rooftop solar and batteries. Our New Jersey permit page tracks it.

If a city is not on the list, assume the traditional process: a plan set, a reviewer and a review queue.

What SolarAPP+ does not replace

SolarAPP+ replaces plan review. It does not replace the inspection, the utility or the rest of the job.

The inspection. The inspector works from the project's SolarAPP+ inspection checklist, which they can print or open by scanning the QR code on the approval document. NREL's FAQ is plain about the consequence: if the installation deviates from the approved design, "this will be discovered at inspection." Fire setbacks are verified on site against the SolarAPP+ fire bulletin.

SolarAPP+ also says installers should be ready to show the inspector module and racking details at final, taken from the manufacturer's installation instructions or certification documents rather than datasheets: certifications, fire classification, load ratings, attachment spacing and flashing details among them. Contra Costa County goes further and asks for a printed, color as-built plan set at least 11 by 17 inches, the approval document and the permit card on site, with a $150 reinspection fee if documents are missing or the system is not installed per plan.

Revisions. Designs change. SolarAPP+ lets you revise and resubmit, re-checks the whole application instantly and issues new approval documents with a new approval ID. The first three revisions are free; after that, each revision costs the project fee again. You are responsible for telling the jurisdiction about the revision, and in GovTech setups, for updating the city's portal to match.

The utility. Interconnection and permission to operate are still the utility's process. Our post on how long a solar permit takes covers where the days go after the permit is issued.

Where SolarAPP+ jobs still go wrong

Instant approval moves the risk from plan check to the field. In practice that means:

  1. Data entry that does not match the roof. The software checks what you typed. If the as-built differs, the inspector finds it.
  2. Equipment that is not on the approved lists. The design will not pass until it is.
  3. Skipped local steps. City business licenses, separate portal filings and local registration still apply.
  4. Missing documents at final. Have the approval document, the latest checklist and the manufacturer documentation on site.

How TaskHatch helps

We file residential solar permits through SolarAPP+ wherever the city participates, on every tier, for same-day issuance, and through full plan review everywhere else. Filing starts at $150 per project with plan check comments included; if the jurisdiction needs new documents from you, the resubmittal is $75. Inspection coordination through final is $100 per project.

Sources

Send us the project.

You shouldn't have to become an expert in every city's permit process just to keep crews working.

$150 to file. $100 to run your inspections through final. City comments never billed, however many rounds.

Questions? Email us at permits@getpromatic.com

Start a Project